- Commercial Greenhouse
- Film Greenhouse
- PC Greenhouse
- Glass Greenhouse
- Tunnel Greenhouse
- Scientific Research Greenhouse
- Vegetable Greenhouse
- Flower Greenhouse
- Multi-span Greenhouse
- Sawtooth Greenhouse
- Greenhouse Equipments
- Greenhouse Accessories
- Hot Dip Galvanized Pipe
- Irrigation System
- Hydroponics System
- Planting Tools
- Planting technology
Tel: +86 191 5068 3942
Fax:
Mobile: +86 191 5068 3942
Contact: Alina
E-mail: sales@cngreenhouses.com
SKYPE:
You are here: China Greenhouse Manufacturers > Commercial Greenhouse > Scientific Research Greenhouse
Research Greenhouse Bay Isolation and Zoning Design
Bay isolation in an industrial glass greenhouse: partitions, independent climate zones, airflow and water paths, entry buffers and which services to split.
.
TEL:+86 191 5068 3942
- Features


A research greenhouse is judged by whether one trial can be kept apart from the next. Temperature, humidity, light and noise hold in a narrower band than in a production house, and the compartment carrying one line of plant material must not influence the one beside it. Ventilation, cooling, warming, irrigation, fertilization and their electric control are all present, but arranged around partitions, benches, test monitoring equipment, a fill light system and in-room automatic control.
Why a research greenhouse is built as isolated units
The brief is set by the work, not the crop. Where a laboratory, a plant material collection and a plant breeding programme share one roof, the strict control each line needs comes from dividing the building into special test rooms with one programme each. This type of scientific research greenhouse separates into many small compartments so rooms are managed individually, and the safety level of the building is higher than in a single span. Animal safety tests and biological safety tests must not share an air path with plant inspection and quarantine rooms.
Physical partitions: walls, floors and seams between bays
A partition isolates only if it is continuous, and the boundary has four parts that must close. The vertical partition runs to the underside of the truss rather than stopping at gutter height, so the space above the gutter is never a shared plenum. The floor is the most often forgotten boundary: a sealed, kerbed floor with its own drain turns a room into a tray, an unsealed one with a common channel links every bay. The frame is hot dip galvanized steel pipe to avoid rust, protected to ISO 9223 and BS EN ISO 14713-1, class C2 to C5. Dividers use the same coverings as the glass greenhouse itself, 8mm polycarbonate hollow sheet and 5mm glass, keeping light transmittance high and warmth in.
Airflow isolation: direction, pressure and dead corners
Air is the fastest route across a boundary, and it follows the path of least resistance rather than the plan. Supply and extract are independent per compartment: air enters low and leaves high at the far side, so the volume is swept once and leaves rather than returning through shared ducting. Where rooms are grouped, the pressure cascade runs from the cleanest unit to the dirtiest, so leakage at a door moves inward at the clean boundary. The house still follows the weather, air temperature lagging the ground by about two hours, so holding back ventilation before planting out, or an inner cover in a weak early-spring light period, must be possible room by room. A controlled environment research greenhouse therefore needs one control loop per unit; how the covering interacts with a trial light is covered under glass covering and light uniformity for trials.
Water, drainage and the separation of wet paths
Water carries nutrients and organisms, so a shared wet path undoes a good partition. Each zone gets its own irrigation manifold fed through a break tank, so it cannot draw back into the main line, and its own dosing point for fertilization rather than a common injection set. Runoff is collected per bay rather than tipped into one open channel; where a trial produces waste water and solid material, that point is what allows it to be turned into a non-toxic state before it leaves the site. Wash points sit at the bay boundary, and tools and sampling equipment stay with the zone that owns them.
Entry buffers, access rules and the cleaning sequence
People are the most common carrier across a boundary. A compartment is entered through a buffer with two doors that are not open at the same time, so the room is never joined to the corridor and the corridor to the next room. Footwear is changed or a footbath used at the inner door, outer clothing stays in the buffer, and a wash point is available before the bench is touched. Benches, or tables, sit inside the zone so potting and sampling happen under the room own conditions. A computer or monitor system records each room climate, and a door registering system logs who entered which unit and when. Cleaning runs one way: cleanest unit first, tools cleaned between rooms, dirtiest zone last.
Shared or dedicated systems, and what weak isolation costs
Which services can be shared settles most of the layout. Power can come off a common board with sub-metering per compartment, and water on one main with an isolation valve per zone, provided the last metre before the plants is separate. The central computer or monitor system can be one machine watching many rooms, but each room needs a controller that holds its own set point and fails safe on its own, since a central failure takes every trial with it. Shading is usually shareable; an internal screen used in a light treatment belongs to the zone. Heating, cooling and ventilation should not be shared between trials meant to be compared, since one duct or valve group removes the difference being measured. The penalty is never a repair bill; it appears as data: a spore through a door frame, a drain that mixes two runoff samples, a controller that pulls two rooms to one temperature on the day it mattered. A trial contaminated that way can only be discarded.
Frequently Asked Questions on zoning and isolation
Q: Why does a research greenhouse need more than one compartment?
A: Because the work is not compatible. A breeding line, a quarantine room, a safety test and a teaching group each need their own band of temperature, humidity, light and noise, and their own access rules. One span holds one condition at a time, so the compartments follow the programmes.
Q: How do you keep air from one trial bay out of the next?
A: Give each compartment its own supply and extract, air in low and out high at the opposite side, and hold the cleanest room at a slightly higher pressure than the dirtiest so leakage moves inward. Seal the partition head, sill and door frame, and close the cavity above the gutter.
Q: Can irrigation and fertigation lines be shared between zones?
A: The main can be shared, the last part cannot. A single main with an isolation valve per zone is normal, but each compartment needs its own manifold through a break tank and its own dosing point. Runoff is collected per bay, so a treatment in one room cannot appear in another.
Q: What does weak isolation actually do to trial data?
A: It removes the difference the trial is trying to measure. Spores, pollen and insects cross a door frame or a shared roof void, a common drain mixes two treatments, and a shared tool moves material between bays. The result is data to be thrown away, and trial units can no longer be treated as independent.
Q: Does every compartment need its own climate controller?
A: For a trial that will be compared with another, yes. One central computer or monitor system can watch many rooms, but each unit needs a controller that holds its own set point and fails safe on its own, so one fault does not take every experiment with it.
Q: What is a door registering system for?
A: It records who entered which compartment and when. Where the compartments hold different tests and safety levels, the log is the only way to answer afterwards whether a person, a tool or a delivery crossed a boundary, and when the last entry was made.
Worldwide cooperation:
We have a professional engineer department and can send engineers to foreign countries to guide the installation. Every year many customers visit our factory, and with above 35 years in this industry we have built and converted research houses for a range of programmes. The work is delivered as metal structures, covering system and install accessories. Background on coverings is available from the United States Department of Agriculture and from the trade coverage at Hortidaily. To discuss how many compartments a programme needs, or how the air and water routes should be split, mail sales@cngreenhouses.com or call +86 191 5068 3942.
Note: If you're interested in the product, please submit your requirements and contacts and then we will contact you in two days. We promise that all your informations won't be leaked to anyone.





Deutsch
Español
Français
Italiano
Português
日本の
한국어
العربية
български
hrvatski
česky
Dansk
Nederlands
suomi
Ελληνικά
हिन्दी
norsk
Polski
Română
русский
Svenska